Waste Water Treatment Plant

Simbach Germany   |   Modernization   |   PE 20.000   |   2008
Poysdorf Austria   |   Mech. Equipment, erection, start-up   |   PE 19.800   |   2008
Focsani Romania   |   Turnkey   |   PE 129.000   |   2009 DOWNLOAD PDF
Sevlievo Bulgaria   |   Mech. Equipment, erection, start-up   |   PE 54.000   |   2009 DOWNLOAD PDF
Katerini Greece   |   Extension / Modernization   |   PE 80.000   |   2010 DOWNLOAD PDF
Amstetten Austria   |   Mech. Equipment (Digester)   |   PE 150.000   |   2010  DOWNLOAD PDF
Ternitz Austria   |   Extension / Modernization   |   PE 41.000   |   2011
Hainbach Austria   |   Mech. Equipment, erection, start-up   |   PE 54.000   |   2011
Karlovac Croatia   |   Turnkey   |   PE 98.500   |   2012
Otok, Cerna, Ivankova Croatia   |   Turnkey   |   PE 22.500   |   2012
Slavonski Brod Croatia   |   Turnkey   |   PE 80.000   |   2013
Tulcea Romania   |   Turnkey   |   PE 100.000   |   2014
Ramsau Austria   |   Mech. Equipment, erection, start-up   |   PE 12.550   |   2014
El Milia* Algeria   |   Turnkey + Operation   |   PE 100.000   |   2015
Varna Bulgaria   |   Modernization   |   PE 360.000   |   2015 DOWNLOAD PDF
Traismauer Austria   |   Extension / Modernization   |   PE 280.000   |   2015 DOWNLOAD PDF
Swarzewo Poland   |   Extension / Modernization   |   PE 176.800   |   2016 DOWNLOAD PDF

* Reference obtained through acquisition Aqua Engineering North Africa

Drinking Water Treatment Plants

Martinesti* Romania   |   Modernization   |   51.840 m³ / day   |   2010
Dumbravia* Romania   |   Modernization   |   77.319 m³ / day   |   2011
Ben Taiba* Algeria   |   Turnkey   |   43.200 m³ / day   |   2015
Sfax* Tunisia   |   Container   |   180 m³ / day   |   2009
Belli* Tunisia   |   Turnkey   |   34.560 m³ / day   |   2015
Ghedir El Golla* Tunisia   |   Turnkey   |   172.800 m³ / day   |   2016

* Reference obtained through acquisition Aqua Engineering North Africa

Desalination – Reverse Osmosis Plants

El Sheik Zowayed* Egypt   |   Turnkey   |   5.000 m³ / day   |   2016
Rafah* Egypt   |   Turnkey   |   5.000 m³ / day   |   2016
Al Arish* Egypt   |   Mech. Equip.   |   5.000 m³ / day   |   2016
Quarghla* Algeria   |   Turnkey   |   60.000 m³ / day   |   2016
South Tunisia* Tunisia   |   Turnkey   |   14.000 m³ / day   |   2016

* Reference obtained through acquisition Aqua Engineering North Africa

Miscellaneous

Flood Control System Golling Austria   |   Pumping Stations   |   11 m³ / s   |   2008
Schottenring Water Intake from Danube Austria   |   Pumping Stations   |   1,5 m³ / s   |   2012
Flood Control System Machland Austria   |   Pumping Stations   |   46 m³ / s   |   2014